Posts made in March, 2008

Engineering Plans Received

Posted by on 4 Mar 2008 | 0 comments

Received the engineering plans about two weeks ago and we are on our way.  Well at least I thought we were.  After looking over the plans I realised that the engineers had left the old concrete slab in.  There is a whole new concrete slab going in for the new extension and unfortunately there is no information in the engineering drawings about the new slab.  After having a friend’s husband look at the plans and confirmed the same thing I phoned the engineers and followed it up with an email explaining what is wrong.  I hope to hear back soon and receive the amended plans so I can...